Te laying out of the raised floor system is simple, fast, easy, and highly flexible, especially the Aluminum stands, while the stone plank can be cut by standard diamond disc and tools. Fire Hydrants, channel?? , and joints have to be tailored made which should be informed with detailed floor plan in advance.

1. Site inspection and measuring
 

2. Laying out Aluminum Stands
 

3. Laying out stone planks
 

4. Covering, and trimming
 

5. Results
 

  < Top >
About Shyr Lai Fa x Stone Instructions x Raised Floor systemx Maintenancex Construction Accomplishmentx Contact Details x Home  
  ADDRESSG No.409, Sec. 2, Jhongsing Rd., Dalin Township, Chiayi County 622, Taiwan (R.O.C.)xTELG886-05-2641716~8x FAXG05-2658299xWEBGwww.stone8.com.tw Email:shyr.laifa@msa.hinet.net